TLDR: In 2026, most Australian kitchen renovations land between about $25,000 and $45,000 for a mid-range job, with budget refreshes from roughly $10,000 and premium kitchens running well past $80,000. Cabinetry is the single biggest cost, often 35 to 45 percent of the budget, followed by benchtops, appliances and the licensed trades. Two things have shifted the maths lately: engineered stone benchtops were banned across Australia from 1 July 2024, so the popular mid-price stone option is gone, and in Queensland any building work over $3,300, plus all electrical and plumbing work, has to be done by a licensed trade. The fastest way to save is to keep your existing layout so you are not paying to move plumbing and wiring.
A kitchen renovation is one of the highest-value jobs you can do to a home, and one of the easiest to overspend on. The trouble with most online price guides is that they quote a single big number and leave you guessing where it comes from. The real answer depends on the size of the room, the finishes you pick, whether you move any walls or plumbing, and who is legally allowed to do the work.
This guide breaks down what a kitchen renovation actually costs in Australia in 2026: the price by tier, where each dollar goes, the recent benchtop rule change that quietly reshaped the mid-range, and the Queensland licensing rules that decide how much of the job is fixed cost. The figures below are industry ranges to plan around, not quotes. For a number tied to your kitchen, it is worth getting a proper kitchen renovation quote.
Kitchen renovation cost at a glance (2026)
Kitchen renovations sit on a wide scale. At one end is a cosmetic refresh that keeps the existing layout and cabinet boxes; at the other is a full custom build with the walls moved and everything new. These are the tiers most Australian renovations fall into:
- Cosmetic refresh: about $8,000 to $20,000. New benchtop, splashback, tapware, cabinet doors and handles, fresh paint and mid-range appliances, keeping the existing cabinet frames and layout. The best value per dollar for a tired but sound kitchen.
- Budget renovation: about $12,000 to $25,000. Flat-pack cabinetry, a laminate benchtop, standard appliances and a tiled splashback, all on the same footprint. A genuinely new kitchen without custom joinery.
- Mid-range renovation: about $25,000 to $45,000. Semi-custom or quality flat-pack cabinetry, a porcelain or stone-look benchtop, a full appliance package, updated lighting and power, and often new flooring. This is where most family kitchens land.
- Premium and luxury: about $45,000 to $80,000, and up. Fully custom joinery, integrated appliances, natural stone or porcelain benchtops and layout changes. A bespoke kitchen in a larger home can pass $100,000.
Industry reports put the national median for a new kitchen somewhere around $30,000 to $35,000, which fits the lower half of the mid-range band. A small kitchen under 10 square metres usually runs $15,000 to $35,000 depending on finish. On location, Brisbane and wider Queensland tend to sit near or a little below the national average, while Sydney and Melbourne can run 15 to 20 percent higher for the same scope. Treat every figure here as a planning guide; the only accurate price is a quote against your actual room.
Where the money actually goes
Understanding the breakdown is what stops a budget getting away from you, because it tells you where a small saving barely moves the total and where a finish upgrade quietly doubles a line. A useful rule of thumb is roughly 40 percent to cabinetry, 15 percent to the benchtop, 15 percent to appliances and around 30 percent to trades and installation, then a 10 to 20 percent contingency on top for the surprises behind the old cabinets.
- Cabinetry (35 to 45 percent of the budget). Almost always the biggest single cost. Flat-pack cabinets sit around $3,000 to $8,000 in materials, semi-custom around $8,000 to $15,000, and fully bespoke joinery from $15,000 to $30,000 or more. Refacing existing boxes with new doors and handles is far cheaper again.
- Benchtops. Laminate runs about $120 to $500 per square metre installed, porcelain and sintered stone about $700 to $1,800, and natural stone like granite or marble from $800 to well over $2,000. The benchtop is often where a mid-range budget tips into premium.
- Appliances. A basic oven, cooktop, rangehood and dishwasher package starts from a couple of thousand dollars, a good mid-range package runs about $4,000 to $10,000, and premium integrated appliances can pass $15,000 to $20,000 on their own.
- Splashback. Tiles are the most affordable option and suit most kitchens. A glass splashback typically runs about $800 to $2,500 depending on size.
- The licensed trades. Plumbing and electrical are a fixed part of any real kitchen renovation, usually several thousand dollars combined once you add rough-in, fit-off and any new circuits. More on why these are non-negotiable below.
- Flooring, demolition and waste. New flooring commonly adds $1,000 to $6,000, and stripping out the old kitchen plus skip and waste fees another $500 to $3,000.

The single most expensive decision is not a material at all; it is whether you move the sink, cooktop or walls. Keep the layout and the plumbing and wiring stay roughly where they are, which keeps the trades bill down. Move them and you add plumbing, electrical and sometimes structural work to the job.
What changed in 2026: the engineered stone benchtop ban
Here is the detail almost every kitchen cost guide still gets wrong. From 1 July 2024, Australia became the first country in the world to ban engineered stone. Safe Work Australia confirms the prohibition covers the manufacture, supply, processing and installation of engineered (artificial) stone benchtops, panels and slabs, with a further ban on importing them from 1 January 2025. The reason is health: engineered stone can be up to around 90 percent crystalline silica, and cutting or grinding it releases a fine dust that causes silicosis, an incurable lung disease.
For a renovation in 2026 this matters to your budget, because engineered stone (the Caesarstone-style quartz product) used to be the affordable mid-price sweet spot that gave you a stone look below the cost of natural stone. That option is gone. It cannot be supplied or installed new, so nobody can legally fit it in your kitchen today.
The good news is that plenty of legal alternatives remain, and this is simply a choice to make with open eyes:
- Porcelain and sintered stone. Now the go-to replacement for the engineered-stone look. Hard-wearing, heat and scratch resistant, and low silica, at roughly $700 to $1,800 per square metre installed.
- Natural stone. Granite and marble are unaffected by the ban and give a genuine stone finish, from about $800 to over $2,000 per square metre.
- Laminate. The budget option and much improved in recent years, with convincing stone-look finishes from about $120 to $500 per square metre.
- Timber and solid surface. Warm, repairable timber, or a seamless moulded solid surface, both fine for the right kitchen.

One reassurance for owners: the ban does not force you to rip out an engineered stone benchtop you already have. An installed benchtop left undisturbed is safe. The rules apply to cutting, grinding and installing new engineered stone, so the choice only affects a benchtop you are replacing now.
What legally needs a licensed trade (and why it is in your budget)
A kitchen renovation is not a job you can fully hand to an unlicensed handyman, and in Queensland the line is clear. According to the QBCC, most building work valued over $3,300, including labour, materials and GST, must be carried out by a QBCC-licensed contractor. A real kitchen renovation almost always passes that figure, so the licensed component is a fixed cost, not an optional one.
- Electrical work always needs a licensed electrician. New power points, lighting circuits, an oven or cooktop connection: any value, no exceptions. It is never a DIY or general-handyman task.
- Plumbing, drainage and gas always need the relevant licence. Moving or connecting a sink, dishwasher or gas cooktop must be done by a licensed plumber or gas fitter, no matter how small the job.
- You cannot split a job to duck the threshold. Regulators treat a renovation as one project regardless of how it is invoiced, so breaking it into small jobs does not make it unlicensed work.
This is not red tape for its own sake. Using an unlicensed operator for work that legally needs a licence can void your home insurance and leaves you without the statutory warranty that covers licensed residential building work over the threshold. If in doubt, ask for a licence number and check it on the QBCC register before anyone starts. The practical takeaway for your budget: assume the electrical and plumbing are a licensed line item, and build them in from the start rather than treating them as an extra.
How to cut the cost without gutting the kitchen
If the layout works and the cabinet boxes are sound, you can get most of the visual result of a full renovation for a fraction of the price. The biggest savings come from what you choose not to change:
- Keep the existing layout. Leaving the sink, cooktop and walls where they are means the plumbing and wiring stay put, which is the single largest saving on any kitchen. Moving them is the quiet budget killer.
- Reface, do not replace, the cabinets. New doors, drawer fronts, handles and a coat of paint on sound carcasses transform a kitchen for a fraction of new joinery.
- Swap the benchtop, splashback and tapware. These are the surfaces you see and touch most. Updating them, plus new fittings, reads as a whole new kitchen.
- Do the safe jobs yourself. Painting, assembling flat-pack cabinets, changing handles and clearing out the old kitchen are all fair game. Leave the electrical, plumbing and gas to the licensed trades.
One local point worth building in: in Brisbane’s humid, subtropical climate, a kitchen takes a beating from moisture and cooking steam. Hybrid or timber-look flooring copes with humidity far better than most, a properly ducted rangehood keeps moisture out of the cabinetry, and good sealing around the sink and splashback protects everything behind it. Spending a little on ventilation and sealing protects the money you have put into the finishes.
A refresh like this is exactly the kind of work a multi-trade team can knock over quickly, and it often runs alongside a bathroom renovation or a wider home renovation while the trades are already on site.
What pushes the price up or down
Two kitchens of the same size can cost thousands apart. These are the factors that decide where your quote lands:
- Size and cabinet run. More cabinetry and benchtop metres means more of the two biggest costs, so a large kitchen scales up quickly.
- Layout changes. Relocating the sink, cooktop or walls adds plumbing, electrical and sometimes structural work. Removing a wall can also need an engineer and council approval.
- Material and finish level. Flat-pack versus custom joinery, and laminate versus porcelain or natural stone, is where the tier is really set.
- The condition of the home. Older homes can hide surprises: non-compliant wiring found at demolition, or asbestos in a kitchen built before the late 1980s, both of which add cost. This is why a contingency matters.
- Lead times and demand. Custom joinery and premium stone can carry long lead times, and trade rates have risen with the skills shortage, so booking early helps.
Planning a kitchen renovation in Brisbane?
Whether it is a smart refresh that keeps your layout or a full rebuild with new joinery and stone, One Call Handyman can handle the lot. We are QBCC licensed and insured, we work across Brisbane and Logan, and because we bring the trades together under one team you get one point of contact, one schedule and one invoice, with a fixed-price quote before we start.
Working out a bigger budget? Our bathroom renovation cost guide and our Brisbane home renovation cost guide break down the numbers the same way.
Get a free quote or call 0485 814 802, and we will give you a real number for your kitchen.
Frequently Asked Questions
How much does a kitchen renovation cost in Australia in 2026?
Most mid-range kitchen renovations cost about $25,000 to $45,000, with the national median sitting around $30,000 to $35,000. A budget or cosmetic refresh can start from roughly $10,000, while a premium kitchen with custom joinery and stone can run past $80,000. Your size, finishes and whether you change the layout decide where you land.
What is the most expensive part of a kitchen renovation?
Cabinetry, almost always. It typically takes 35 to 45 percent of the budget, ahead of the benchtop and appliances. Choosing flat-pack or refacing existing boxes rather than fully custom joinery is one of the biggest levers you have on the total.
Can I still get an engineered stone benchtop?
No. Engineered (artificial) stone has been banned across Australia since 1 July 2024, so it cannot be supplied or installed new. The popular replacements are porcelain and sintered stone for a similar look, natural stone like granite, or laminate at the budget end. An engineered stone benchtop already installed in your home is safe and does not have to be removed.
Do I need a licence or approval to renovate my kitchen in Queensland?
The work itself must be done by licensed trades: any building work over $3,300 needs a QBCC-licensed contractor, and all electrical, plumbing and gas work needs the relevant licence regardless of cost. A straightforward internal kitchen renovation usually does not need planning approval, but removing a structural wall can require an engineer and council approval, so check before you knock anything out.
How can I renovate my kitchen on a budget?
Keep the existing layout so you are not paying to move plumbing and wiring, reface the cabinets instead of replacing them, and update the benchtop, splashback, tapware and handles. Choose flat-pack cabinetry and laminate or a single stone-look surface, and do the safe jobs like painting and demolition yourself while leaving the licensed trades to the pros.
How long does a kitchen renovation take?
A straightforward renovation on the existing footprint usually runs about three to six weeks on site once materials are ready. Custom joinery and premium stone carry longer lead times, sometimes a few months, so the build often waits on the cabinetry rather than the trades. Planning the order of works well is what keeps a kitchen job on schedule.